In the time period of 118 days beginning September 9, 2024, the data indicates 3 operability checks were conducted for global-act.koeln. Availability tests determined global-act.koeln was functional 3 times, the last check on September 10, 2024, resulted in a 200 status code. As of January 6, 2025, there were no reported instances of downtime for global-act.koeln during inspections. Replies received as of January 6, 2025, confirm that no response had an error status code. At 0.563 seconds, global-act.koeln's September 10, 2024, response contrasted with its average of 0.604 seconds.